We have expanded our production infrastructure with a new mould warehouse at our Correggio facility, designed to ensure efficient, safe and traceable management of our entire mould inventory.
The new facility features over 600 multi-article storage locations — each position can accommodate multiple different moulds — significantly increasing our overall storage capacity. The structure meets seismic-resistant standards and supports a maximum load of 2,000 kg per shelf, ensuring the highest safety levels during handling operations.
The management systems we have put in place enable precise traceability of every mould, reducing intervention times and optimising production continuity for the benefit of our customers.
This investment integrates seamlessly with the technologies and processes already in place at our Correggio plant, and represents a further step in our commitment to innovation and quality — a journey spanning over 50 years.